Case Study
Data Safe, Newark, CA – Invisible Structures
Data Safe, Newark, CA – Invisible Structures May 11, 2016 The finished Gravelpave2 fire lane.Gravel is place into the rings. Do not drive on empty rings – follow the procedure shown here.Black Gravelpave2 opens up to a wider area in the back corner of the building.Gravelpave2 is fitted to the area.A close-up of the gravel fill in the cylinders and void space of Gravelpave2.The 13,000 sq ft of black Gravelpave2 is ready for fill.A view of the gravel being pushed into the Gravelpave2.