Case Study

Data Safe, Newark, CA – Invisible Structures

Data Safe, Newark, CA – Invisible Structures

Data Safe, Newark, CA – Invisible Structures May 11, 2016 The finished Gravelpave2 fire lane.Gravel is place into the rings. Do not drive on empty rings – follow the procedure shown here.Black Gravelpave2 opens up to a wider area in the back corner of the building.Gravelpave2 is fitted to the area.A close-up of the gravel fill in the cylinders and void space of Gravelpave2.The 13,000 sq ft of black Gravelpave2 is ready for fill.A view of the gravel being pushed into the Gravelpave2.

Join for free to read