Case Study

Data Center Air Cooling System Conversion Project Validated Using AFT Fathom

Data Center Air Cooling System Conversion Project Validated Using AFT Fathom

Applied Flow Technology · 2955 Professional Place, Suite 301 · Colorado Springs, CO 80904 USA · www.aft.com Swanson Rink Denver, Colorado, USA Platinum Pipe Award Honorable Mention - Software Features and Model Creativity Swanson Rink was tasked with developing a master plan for converting a high-rise office building into a multi- user, data center space. The client wished to use as much of the existing air conditioning system as possible