Case Study
Dallas TX
CVK and Natgun Generations Strong In 1989, (a large semi-conductor chip manufacturer) contracted ON Tanks to construct a partially buried 2.7 MG thermal energy storage (TES) tank for the purpose of saving energy costs by taking advantage of the time-of-use electric rates. The TES system was designed to shift the electric load of the chillers and associated cooling equipment from the on-peak periods (daytime), to the off-peak periods (night t