Case Study
Dakota Valley Grain Unit Train Loadout Facility
Leaders in the design and construction of bulk materials handling facilities Marion, South Dakota The new workhouse at Marion, South Dakota, consists of two 50-foot-diameter silos with two interstice bins 120 feet high with 8-inch-thick walls and three 90-foot-diameter cor- rugated steel silos. Grain receiving will be through a double driveway , with 500-bushel hoppers and one 40,000- and one 20,000-bushel-per-hour receiving belt conveyors to on