Case Study

Dakota Valley Grain Unit Train Loadout Facility

Dakota Valley Grain Unit Train Loadout Facility

Pages 1 Pages

Leaders in the design and construction of bulk materials handling facilities Marion, South Dakota The new workhouse at Marion, South Dakota, consists of two 50-foot-diameter silos with two interstice bins 120 feet high with 8-inch-thick walls and three 90-foot-diameter cor- rugated steel silos. Grain receiving will be through a double driveway , with 500-bushel hoppers and one 40,000- and one 20,000-bushel-per-hour receiving belt conveyors to on

Join for free to read