Case Study

Daikin Modular Central Plant Improves Efficiency and Reduces Construction Costs at Chaparral High School

Daikin Modular Central Plant Improves Efficiency and Reduces Construction Costs at Chaparral High School

Pages 2 Pages

CASE STUDY K-12 Education Since the commissioning of the Daikin Modular Central Plant in early summer 2007, Chaparral High School has seen electrical savings of $8000 a month over its old system, even with the expanded size of the school campus. Daikin Modular Central Plant Improves Efficiency and Reduces Construction Costs at Chaparral High School The ability to meet a fast-track, multi-phased construction schedule and energy efficiency goal

Join for free to read