Case Study

CUSTOM’s Flooring Preparation Products Provide Long Term Security at Reagan National Airport

CUSTOM’s Flooring Preparation Products Provide Long Term Security at Reagan National Airport

Pages 2 Pages

CUSTOM’s Flooring Preparation Products Provide Long Term Security at Reagan National Airport A CUSTOM Case Study RONALD REAGAN AIRPORT Ronald Reagan Washington National Airport (DCA) is located just three miles from the nation’s capital. When expanding Terminal A in 2014 to accommodate increased passenger traffic, the Metropolitan Washington Airport Authority was taking no chances on a system failure. That’s why a full system of CustomTech flooring preparation products was chosen for their new security screening area. Award-winning David Allen Company originally bid the DCA surface leveling job using other products, but switched when they learned about CUSTOM’s flooring preparation line. Project specifications called for 12" x 24" porcelain tile to be set over 14,000 square f

Join for free to read