Custom Injection Pattern Solves Settlement Issue in Tennessee

Custom Injection Pattern Solves Settlement Issue in Tennessee

Pages 2 Pages

Problem Outside Tullahoma, Tennessee, the approaches on both sides of a triple box culvert had settled repeatedly over the years, resulting in dips at the surface and poor rideability. The asphalt paving was overlaid multiple times, and state highway officials had tried other more extensive repairs as well. Despite all their efforts, the settlement issues continued to persist and worsen. At a point when road closure was being debated, TDOT reached out to URETEK. Analysis Upon inspection, URETEK crews determined that the back-fill materials against the side of the box culvert were consolidating and subsiding. Most often when this happens, it is due to poor compaction of unsuitable materials used in the back-fill. The road above is four lanes wide with an additional center lane an