Case Study
Cullerin Range Wind Farm SCADA Upgrade
Client Origin Energy Location New South Wales Value $100,000 Duration August - November 2010 Project Overview Origin Energy sought to upgrade and enhance their Citect SCADA system at their Cullerin Range Wind Farm. SAGE worked closely with Origin to develop the project scope then design and cost a solution that met the requirements of the business. The SAGE project scope included: Upgrade Citect SCADA project to version 7.1 Im