Case Study

CT peaking plant uses mobile water system for operating savings

CT peaking plant uses mobile water system for operating savings

Find a contact near you by visiting www.suezwatertechnologies.com and clicking on “Contact Us.” *Trademark of SUEZ; may be registered in one or more countries. ©2017 SUEZ. All rights reserved. CS1041EN May-10 Water Technologies & Solutions case study CT peaking plant uses mobile water system for operating savings challenge A 340-megawatt dual-fuel combustion turbine merchant power plant was designed to operate about 500 hours per year, primarily in the summer months. For emissions control, demineralized water is required for injection to exhaust gas at 450 gpm (1.7 m 3 /minute). The plant owner needed a large water treatment system, but also needed to produce low-cost power for the merchant market. It was not a good economic choice to make a large capital invest