Case Study

CSU Staff Re-pipes Data Center While Remaining Operational With Assist From PP-R Pipe

CSU Staff Re-pipes Data Center While Remaining Operational With Assist From PP-R Pipe

Pages 1 Pages

www.aquatherm.com 500 S 500 W Lindon, UT 84042 801-805-6657 CSU Staff Re -pipeS Data CenteR while Remaining OpeRatiOnal with a SSiSt fROm pp-R p ipe “The number one reason we opted to use it on this project was the application inside the room. We couldn’t shut down the system and needed a product that could go under the floor, be reliable, and that didn’t require soldering or welding.” - Gene Ellis, Mech