Case Study
Crystal Palace National Sports Centre
Once the swimming pool had been completed, the Cavity membrane division of Cemplas followed on to deal with water ingress in the plant rooms and vast ventilation tunnels. Using Sika’ s Cavity Drainage System this was applied to cover the walls and ?oors. Once the Cavity Drainage System had been installed, a plaster membrane was applied to the walls, and a screed incorporating a drainage channel was laid over the membrane. A sump was created, and