Crossrail

Crossrail

Pages 3 Pages

Cr o ssr ail Programme 2015 - Ongoing Sectors Technology Client Laing O'Rourke Appointments Design for Manufacture and Assembly Bryden Wood were asked by Laing O’Rourke to evaluate the detail design and installation of the Crossrail intended tunnel lining. Afterpresenting our initial ndings we were commissioned to develop the design and installation principles of the lining system and apply it initially to Tottenham Court Road and Liverpool Street stations. The ‘LOR’ solution has been adopted by Crossrail as their preferred solution and LOR have been approached by other Crossrail contractors’ groups to provide the lining system throughout the Crossrail network. The LOR solution follows manufacturing principles in contrast to the site-based solutions typical in civil engineering and infras