Case Study
Crewe Green Link Road
Project overview The Crewe Green Link Road (South) scheme is a new dual carriageway running north-south between the Weston Gate roundabout on the A5020 Weston Road and the A500 Hough-Shavington bypass. Construction required the provision of a new rail bridge to carry the existing Crewe to Derby railway line over the new carriageway. The Crewe Green new bridge, was assembled in an area 45m from its final position, adjacent to the live rail