Case Study

Copper Mine Conveying System (Stacker/ Conveyer Bridge)

Copper Mine Conveying System (Stacker/ Conveyer Bridge)

www.conductix.com REF0360-0003a-E Installation description Copper Mine Conveying System (Stacker/ Conveyer Bridge) Operator Southern Peru Copper Corporation Customer MAN TAKRAF Travel speed 10 m/min Travel distance 8 m / 5 m Loop depth 0,35 m / 0,5 m Product Round Cable Trolley in special design Pivoting angle +/- 120° Environmental conditions Acidly Speci? c features Stainless steel - Operation: 24h/day, 7 days/week, 20 years Project installati

Join for free to read