Case Study

Cooling Water Supply System for Energy Station, Sandy Creek Power Partners

Cooling Water Supply System for Energy Station, Sandy Creek Power Partners

19 18 Sandy Creek Power Partners managed construction of the Sandy Creek Energy Station, a nominal 900-MW, coal-fired electric generating station in Riesel, Texas. In 2008, FNI was contracted to assist with the design of a cooling water supply system for the new coal-fired plant. The system was required to transfer the Type II treated effluent from the existing chlorine contact basins at the Waco Metropolitan Area Regional Sewer System Waste

Join for free to read