Cooling Tower Limescale Treatment with Minimal Downtime and Increased Safety | Rio Tinto 4th February 2014 | descaling, limescale cleaner How Triple7 enabled Rio Tinto to reduce cleaning downtime Envirofluid was able to provide Rio Tinto with a worksafe organic descaler blend which was guaranteed to not erode metal surfaces or create waste water treatment issues. Improving Lives The low risk acid blend especially designed with human safety in mind meant that minimal safety equipment was utilised and provided reduced effort in the preparation of a Safe Work Method Statement (SWIM). Improving Business Rio Tinto were able to complete the tower limescale cleaning operation within a 24 hour period without dismantling any item on the system. The wastewater flush was able to be drained to their T