Cooke & Dowsett - 180 Brisbane Tower
MM KEMBLA - CASE STUDY COOKE & DOWSETT 180 BRISBANE TOWER KemPress Stainless has been used for the rising main with operating pressure of up to 2500 kPa as well as the rainwater and grey water re-use systems. Kembla Copper tube was also used with the KemPress press fit system. MM Kembla worked closely with the hydraulic services contractor, Cooke & Dowsett to make sure the project went smoothly and that the right products and tools were used. Chris Mutimer, the site manager for Cooke & Dowsett explained that KemPress Stainless 316 L tube and press fittings are of the highest quality, and the extensive range of fittings and adaptors helped them to complete the installation quickly and professionally. He also commented. “ MM Kembla also provided technical information