Case Study
Controlled Vibration Blasting
Case Study Controlled Vibration Blasting Close proximity blasting at Mugga Lane Quarry, ACT Page 1 | © Copyright Orica Limited Group www.oricaminingservices.com | Document reference: 100046 Site Profile Boral’s Mugga Lane Quarry is located near the border of New South Wales (NSW) and the Australian Capital Territory (ACT). The quarry produces aggregates and road base for the Canberra Region within the ACT. The Situation Orica