Control Panel Upgrade
Length of relationship: 14 years - ongoing Location(s): RAF Akrotiri Work undertaken: Obsolete Dale 8000 generator controllers on base had failed and the client needed to re- instate generator cover with immediate effect. The system consisted of two 1.6MVA Leroy Sommer generators powered by Caterpillar diesel engines. The system generated at 11kV with both sets operating in parallel with each other and the local authority supply. Within weeks o