Case Study

Contour Strengthens Welded Joints for HDD

Contour Strengthens Welded Joints for HDD

Pages 2 Pages

THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Contour Strengthens Welded Joints for HDD PIPE DETAIL Welding joints on a 1,000- mm (39.3-inch) carbon steel natural gas line needed reinforcement 8° C (46° F) Ambient Temperature SUMMARY Contour provided reinforcement on a 1,000-mm (39.3-inch) carbon steel natural gas line 3 technicians completed the installation in 4 hours followed by 12 hours curing time Despite the low-temperature conditions, the composite cured in 12 hours No disruption to operations A gas company in Poland that was beginning a construction project had heard about Clock Spring Contour technology and wanted to use it as an abrasion-resistant overlay for additional protection over a welded joint on a 1,0