Case Study

Contour Corrects Internal Erosion Defect Oshore

Contour Corrects Internal Erosion Defect Oshore

Pages 2 Pages

THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Contour Corrects Internal Erosion Defect Oshore PIPE DETAIL 102-mm (4-in) diameter pipe experienced internal erosion that resulted in a through-wall defect 8.56 mm (0.34 in) original wall thickness. SUMMARY 102-mm (4-in) diameter pipe experienced internal erosion that resulted in a through-wall defect A team of 2 local Clock Spring trained technicians completed the 8-layer Contour repair in 2 days No hot work was required during the repair application Operations resumed safely until a permanent repair could be executed Internal erosion on a 102- mm (4-in) diameter cushion T on an offshore facility had resulted in a through-wall defect that required immediate attention to m

Join for free to read