Contour Achieves Pressure Containment, Reinforcement on 6-inch Kickback Line

Contour Achieves Pressure Containment, Reinforcement on 6-inch Kickback Line

Pages 4 Pages

THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Contour Achieves Pressure Containment, Reinforcement on 6-inch Kickback Line PIPE DETAIL 6-inch (152-mm) diameter Ethylene 148° C (298° F) operating temperature SUMMARY Pipe damage significant internal corrosion and through wall leaks Clock Spring trained and certified installers applied 4 layers of Contour to the damaged areas of pipe Contour was applied to areas with complex geometry, including injection nozzles, bolted repair clamps, valve bodies and uneven surfaces This complicated repair was executed in 1 week The Contour repair will allow the pipe to work safely for another 5 years A Saudi Arabia-based affiliate of SABIC discovered significant internal corrosion on a