Case Study
Constructing the Christie Proton Beam Therapy Centre
Constructing the Christie Proton Beam Therapy Centre Two proton beam therapy (PBT) centres are being developed nationally, one at The Christie and the other at University College London Hospitals NHS Foundation Trust. They are both being funded by a £250 million government investment. Interserve was appointed to design and deliver the Manchester PBT centre through a rigorous P21+ procurement process. The state of the art five storey building will provide: Three treatment gantries and a research room A patient reception Consultation rooms Public space Building design The building is designed to be future proofed - the research room can in future be equipped with a treatment gantry, a structure to support the equipment that delivers the treatment, if required. Prior to appointment Interserv