Case Study

Consolidated Grain Barge Loading Terminal

Consolidated Grain Barge Loading Terminal

Pages 1 Pages

Leaders in the design and construction of bulk materials handling facilities Jeffersonville, Indiana The Consolidated Grain project consisted of eight 32-foot tanks with interstices 117 feet tall. The facility can receive grain by truck and rail (100 car trains) at 30,000 bushel per hour. The receiving system features two 1,000-bushel truck pits and one rail pit. Each truck pit feeds a 15,000-bushel-per-hour leg. Barge loadout capacity with a

Join for free to read