Case Study
Congress Palace
Engineering, design, supply, installation, testing and commissioning of HV/MV substations (Lot 561). Exploitation of a generating station 20kV MV/LV equipped with an automated centralized system (Lot 560). Exploitation of the LV general boards sets. Securing a full operation and maintenance of the project upon taking over for a period of 18 months. Contractor MATELEC, Lebanon Customer OGER LIBAN Location Damascus - Syria Consultant OGER INTERNATI