Case Study
Concrete Batching Plant Survey: Utility Mapping Survey
CASE STUDY PRODAR recently completed a utility mapping sur- vey at a concrete batching plant for a Readymix Con- crete company in Hull. In total, the survey area was approximately 3,000m 2 in size and comprised the main plant yard and adja- cent footpaths and highway. Operations were carried out over a two day period, and combined radio- frequency, ground probing radar and digital land surveying techniques. +44 (0)1482 778 588 Location: Hull Site: Concrete Batching Plant Survey: Utility Mapping Survey Date: October 2008