Compressing the Time Cycle
Compressing the Time Cycle The implementation of durability analysis at John Deere Welland Works was one of the key factors in reducing development time for their rotary cutter systems. On the last two product generations, each design and test cycle was completed in one or two weeks using a virtual prototype instead of several months as required by physical prototypes. As a result, development on a 20-foot cutter was reduced from about four