Compressco Increases Production Rate by 67% in Eastern Oklahoma
Compressco Increases Production Rate by 67% in Eastern Oklahoma Results: The operator installed the GasJack on tubing of a gas well and the daily production rate leveled off, increasing from 300 to 500 MCFGPD. #135 Date of report: 04/15/2009 Application: Installed on tubing Reservoir: Spiro Location: Latimer Co., Oklahoma