Case Study
Commuter Train Waiting Room Floor Is Protected And Given Slip-Resistance With CHEMCLAD
Copyright ©2014 by ® ENECON Corporation. ® 6 Platinum Court • Medford, NY 11763 Toll Free: 888-4-ENECON (888-436-3266) • Phone: 516-349-0022 • Fax: 516-349-5522 ® www.enecon.com • info@enecon.com CH-067 ® The floor was prepared by diamond grinding followed by a thorough cleaning. CHEMCLAD P4C was used to prime and seal the concrete surface. Before Before Af ter Af ter CHEMCLAD SC was applied and aluminum oxide was broadcast on the floor and