Case Study
Command Center and Data Center
Project Size: 2500 SF, Command Center and Data Center Project Size: 2500 SF, Command Center and Data Center Project Duration: 5 months Availability: N+1 Project Duration: 5 months Availability: N+1 This project encompassed the full range of Data Center Design – Build services. These include: project design, project engineering, general construction, raised ooring, re protection systems, precision air conditioning, electrical service upgrades, equipment racks with UPS protection, video distribution systems, and command center furnishings. The Facility speci ed three separate spaces for construction. These were a re protected, temperature and humidity controlled Data Center, Command Center, and a co-located backup recovery site. This area was built to provide N+1 redundancy. Each area