Case Study

Columbia Irrigation District

Columbia Irrigation District

PROJECT: Restoration of Metal Irrigation Flumes LOCATION: Kennewick, WA OWNER: Columbia Irrigation District APPLICATOR: Matheson Painting SYSTEM: Polyshield SS™ 100 TOTAL AREA: 26,000 square feet COMPLETION DATE: March 2000 PROBLEM: Three galvanized steel ?umes originally constructed in 1984 were corroded and leaking. The replacement of the ?umes and other repair methods were evaluated, but not feasible due to cost. The irrigati

Join for free to read