Case Study
Colonial Village
In November 2009, a request was made by Water Management on behalf of Colonial Village apartments for Washington Gas to upgrade the exis ng gas meters on the property for their 27 garden style apartment buildings to handle an increased load. Since then 199k BTU gas ?red hot water heaters were placed in the laundry rooms of each of the 27 buildings therefore reducing the water hea ng load on the two previous centralized water boilers located a