Case Study
Collezioni
Case Study Collezioni Client: ER Spa Location: Glasgow Airport Value: £82,000 Timescale: 4 weeks Challenge To construct a high-end retail outlet for an Italian designer marque in the international departures area at Glasgow Airport, through which more than three million departing travellers pass every year. Approach Because of the short lead time – Pacific Building were instructed in December, 2011, and the unit had to be open and trading for the busy festive period – a fast-track approach was required. As a result, Pacific drew on their vast experience of working in “live” public areas, to tight deadlines, within budget and with minimum disruption to airport operations and to neighbouring trade. They were also able to take advantage of the close proximity