Case Study

Collector System Design and Installation for Canada’s Largest Wind Farm

Collector System Design and Installation for Canada’s Largest Wind Farm

Turnkey Projects April 11, 2005© S&C Electric Company August 25, 2008© S&C Electric Company Case Study 180-1041 Collector System Design and Installation for Canada’s Largest Wind Farm Background To effectively harness wind energy, wind turbine generators must be strategically placed in areas with high average airflow velocities, with considerable separation between the generators. As a result, wind farms are often sited on gigantic parce

Join for free to read