Case Study

Coleman A. Young International Airport Detroit, MI - USA

Coleman A. Young International Airport Detroit, MI - USA

Coleman A. Young International Airport Detroit, MI - USA Project Description Results At the end of runway 15/33, an area of 1.5 acres was constantly saturated with water. Since 1999, it was chronically wet and it was only possible to mow the grass a few times during late summer. It was also impossible to install required underground cable. On February 26, 2012, PARJANA® Distribution installed the EGRP® on this test site. By May 12, 2012 the

Join for free to read