Case Study

COL DE PRONY WIND FARM

COL DE PRONY WIND FARM

Pages 2 Pages

COL DE PRONY WIND FARM Mont Dore, New Caledonia Customer: EOLE - Prony I, II, III & EOLE - Mont-Mau Wind Turbine: 84 Vergnet GEV MP-C wind turbines Total power: 21.5 MW Commissioned: 2004-2007 Operations and Maintenance: Vergnet Pacific Col de Prony Wind Farm, Mont Dore, New Caledonia, French Overseas Territory Vergnet GEV MP Wind Turbines Deliver Energy and Cost Savings for EOLE Prony Prony wind farm is part of renewable energy development continuity in French overseas territory and, in particular, in New Caledonia. With 84 wind turbines generating 21.5 MW of power, Col de Prony wind farm is powering the electricity needs of the entire city of Mont Dore and its 27,155 inhabitants, the second largest city in New Caledonia in terms of population. Wind Energy Approach – I

Join for free to read