Case Study
Coke Plant Scrubber Water
Case Study: Coke Plant Scrubber Water Location: Duisburg (Germany) Conditions: Solution The pilot plant (400 m³ /h) contained 3 automatic filters with a metal mesh size of 100 micron. The plant was commissioned in June 2014 and treated 100% of the scrubber water from July 2014. Due to the good results the customer decided to integrate the pilot in its regular operations and roll out the solution in another