Case Study

Coca-Cola Savings

Coca-Cola Savings

Coca-Cola Savings The Coca-Cola Bottling plant in Downey, CA had difficulties with wet cans, resulting in illegible lot/date codes and “can bursts” that caused ruined packaging and unsellable pallets of product. The compressed air system Coke was using was not doing an adequate job of drying the cans, as well as being inordinately expensive in energy costs. Coke contacted JetAir Technologies to resolve their drying issues. JetAir, in conjunction with WahlWorks Engineering, designed a drying system using the JET-2 Blower and unique JetAir JetBlasts. The JetAir/WahlWorks drying system dries the tops and bottoms of the Coke cans much more effectively and has eliminated the problems associated with cans bursting and illegible date/lot codes while consuming much less power. Coke is very happy w

Join for free to read