Case Study

Coastal Gujarat Power Limited

Coastal Gujarat Power Limited

Pages 3 Pages

Company Coastal Gujarat Power Limited (Tata Power Company) Project e-Permit to Work (PTW) Software Objective To replace the existing Paper based PTW systems to Electronic System Location 1,200 hectare site, south of Tunda village in Mundra taluka, Kutch district of Gujarat Case Study ASK-EHS ENGINEERING & CONSULTANTS PVT. PTD. 1 BUSINESS CASE A Tata Group company always ensures highest quality and safety orientation as a part of their work ethics. This prestigious project was no different. Hence, getting registered as a service vendor within the organization meant passing through stringent processes of quality and safety scrutiny. In the pre-commissioning phase of their 4000 MW project at Mundra, Tata Power wanted to adopt an electronic system t

Join for free to read