Case Study

CN Sunfish Pond

CN Sunfish Pond

Y ear: Technology: 2006 Soil Nailing Geo-Foundations was contracted by CN Rail in 2006 to create a sys- tem for rapidly installing grout-flushed soil nails into an existing embank- ment supporting a twin railroad overlooking Sunfish Pond in Burlington, Ontario. The soil nailing was a key component in the design for up- grading and stabilizing the embankment prior to its being expanded to host a third rail. The soil nail installation system wa