Case Study

Clock Spring Repairs Mechanical Damage from Alkaline Soil Erosion

Clock Spring Repairs Mechanical Damage from Alkaline Soil Erosion

Pages 2 Pages

THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Clock Spring Repairs Mechanical Damage from Alkaline Soil Erosion PIPE DETAIL 28-inch (711-mm) diameter 2 bar (1,050 psi) operating pressure 27° C (81° F) operating temperature. SUMMARY 4 Clock Spring repair sleeves were installed on a section of 28-inch (711-mm) diameter pipeline damaged by alkaline soil A team of Clock Spring certified technicians effectively installed the repair in 1 day. The installation allowed the pipeline to be put into service safely, without the use of heavy lifting equipment or hot work The installation of the Clock Spring Spacers allowed the company to meet its safety objectives during the installation process and to achieve its operational objec