Cleveland Museum of Art

Cleveland Museum of Art

Pages 1 Pages

PROJECT PROFILE WJE www.wje.com Cleveland Museum of Art Investigation of Water Infiltration into the Breuer Entry Vestibule | Cleveland, OH CLIENT The Rise Group BACKGROUND The original CMA building was constructed in 1916. The Breuer Building, designed by renowned architect Marcel Breuer, was added in 1971 and has granite cladding on precast concrete panels. As part of a renovation and expansion project, the main entrance to the Breuer Building was renovated to include an expanded grade-level custom glass entry vestibule and a below-grade pedestrian tunnel connecting the museum to an adjacent parking garage. The roof and walls of the new entrance lobby abut the