Case Study
CLEAR LAKE IS FIRST IN IOWA TO PROVIDE REUSE WATER FOR POWER PLANT!
PLANT NAME AND LOCATION DESIGN DAILY FLOW / PEAK FLOW AQUA-AEROBIC SOLUTION SUCCESS STORIES Clear Lake Sanitary District (CLSD) was originally built in the early 1950s and utilized a trickling ? lter system. By 1988, the treatment needs of the growing population and increasing storm ? ow discharges required the plant to be upgraded. In order to meet more stringent requirements de? ned by the NPDES permitting authority, the plant under