Cost Savings over Chemicals – St. Robert PROFILE PROJECT No. 6 Lift Station City of St. Robert, Missouri CONTACT Steve Long Public Works Foreman, City of St. Robert ENGINEER Jeff Medows, P.E. C.M. Archer Group, P.C. CONTRACTOR Installed by municipality INSTALLATION One Vortex Flow Insert Type: Force Main Cost: $25,750 (construction & installation) Flow Range: 0.48 – 3.65 MGD Peak Flow: 3.17 MGD VFI Design: 32" Top Form, 6' Drop FYMNVFIP100412 ORD