Case Study
City of Menominee, MI
PROBLEM FACED In 2009, the city of Menominee, Michigan decided its wastewater treatment plant was consuming excessive electrical power and faced a much needed upgrade. The plant was using a 1044-unit ceramic disc system with an acid gas cleaning system. This system, installed in 1988, was deteriorating and needed to be replaced. The city worked with Honeywell Energy Services Group to reduce the city’s electrical power consumption under a guar