Case Study
Choctaw Point Container Terminal
Choctaw Point Container Terminal Mobile, AL Installing Wick Drains near the port terminal bulkhead. To improve the weak soil conditions at a port container terminal, Menard installed 94,000 Wick Drains, totaling nearly 4.3 million linear feet. Project Summary Menard completed one if its largest Prefabricated Vertical Drain (Wick Drain) projects, at the Alabama State Port Authority’s Choctaw Point Container Terminal in Mobile, AL. The state-of