Case Study

Cheshire Materials Recycling Facility... Legato blocks

Cheshire Materials Recycling Facility... Legato blocks

continued overleaf... Elite were approached by Wigan and North Wales based civil engineering company DXI. They had been tasked with the job of refurbishing a Materials Recycling Facility in Ellesmere Port, Cheshire. The issues faced were that existing holding bay walls had become damaged and were no longer stable. These needed to be removed and replaced with a suitable alternative. As this was an active MRF the work had to be carried out efficiently and with the minimum of disruption. In order to accommodate the MRF’s operational hours DXI worked at weekends and overnight to remove the existing damaged holding bay walls. For speed the walls were removed intact and disposed of off-site. After consultation with Elite Precast Concrete it was decided that replacing the existing hol

Join for free to read