Case Study
Charlotte Street Car Project
Charlotte Street Car Project Location: Charlotte, NC Pipe Used: 4-, 6-, 8-, 10-, 12-, and 16-inch of Eagle Loc C900 DR 14 Quantity of Pipe: 140 feet of 4-inch Eagle Loc 2,400 feet of 6-inch Eagle Loc 3,700 feet of 8-inch Eagle Loc 2,100 feet of 10-inch Eagle Loc 17,600 feet of 12-inch Eagle Loc 4,500 feet of 16-inch Eagle Loc Type of Project: Water Line Installation Duration of Project Installation: Installation began February 2013 Additional Co