EDUCATION CHARLES STURT UNIVERSITY ENGINEERING BUILDING, BATHURST CAMPUS The design and integration of audio visual and collaborative technology was integral to this building andthe learning environment. It includes a collaborative learning zone, maker studios, project spaces, workshops and a gallery, as well as a ‘ p it ch z on e ’ for fine-tuning entrepreneurial skills. ThePitchZonewasdesignedfor student andstaff to present their work to others within the room and abroad via video conferencing. A custom fully wireless presentation display solution was designed to cater as a low profile unobtrusive visual aidwhendoing apresentation. The technology wall in the Engineering foyer is the largest Planar Clarity Matrix video wall incorporated touch in the southern hemisphere. The 1.8 metre tall