Case Study

CENTUM CS 3000 R3/UOI Improves Reliability and Efficiency by Integrating Systems Controls at Bucuresti Vest Power Plant

CENTUM CS 3000 R3/UOI Improves Reliability and Efficiency by Integrating Systems Controls at Bucuresti Vest Power Plant

Pages 4 Pages

Location: Order Date: Completion: Industry: http://www.yokogawa.com/suc/ SUCCESS STORY Bucharest, Romania May 2005 March 2009 Power Plant Data Plant type: Combined cycle heat and power plant Unit configuration: 1 gas turbine, 1 steam turbine, and 1 heat recovery steam generator Output: 186 MW (electric), 197 MW (thermal) Owner: SC Electrocentrale Bucure ?ti SA CENTUM CS 3000 R3/UOI Improves Rel

Join for free to read